• ul. Górników Staszicowskich 57, 25-804 Kielce
  • 41 243 50 82
  • pl
  • en
  • de
  • fr
  • it

IMPLEMENTATIONS

Feel free to learn about our implementations.
The presented projects constitute merely a part of the works performed by our company from its very beginning.

Assembly of WP5 cooling system

Assembly of supply and return pipelines including modernization of the pumping station of big stove No. 5 cooling system – estimated installation tonnage 140 t, the length: approximately 1,350 linear metres. The deadline: 2016.

Assembly of the converter structure with protective installation.

Participation in assembling and welding of the converter structural elements and the protective sheathing structural elements. The thickness range: from 100 mm to 120 mm.

IMOS II EDF RYBNIK

Assembling technological pipelines on EDF wet flue gas desulphurization plant RYBNIK – estimated installation tonnage 90 t, the length: approximately 5,500 linear metres, stainless materials. The deadline: 2015/2016.

Overhaul and inspection of conveyors

Overhaul and inspection of conveyors

Overhaul of inspection holes

Complete overhaul of ball mill 41.46

Complete overhaul of ball mill 41.46

Complete overhaul of mill Pfeiffer MPS2500GC

Complete overhaul of mill Pfeiffer MPS2500GC

Overhaul of star feeders

Overhaul of star feeders

Overhaul hydrate devices

Overhaul hydrate devices

Overhaul of cyclone inlet and jacket

Overhaul of cyclone inlet and jacket

Overhaul of cyclone inlet and jacket

Overhaul of cyclone inlet and jacket

Welding works of shaft of furnace Maerz Sh1, Sh2

Welding works of shaft of furnace Maerz Sh1, Sh2

Overhaul of rock tank

Overhaul of rock tank

Disassembly and assembly and cleaning of dryer exchanger pipes – zone III, I/II, initial zone

Disassembly and assembly and cleaning of dryer exchanger pipes – zone III, I/II, initial zone

Disassembly and assembly and cleaning of dryer exchanger pipes – zone III, I/II, initial zone

Disassembly and assembly and cleaning of dryer exchanger pipes – zone III, I/II, initial zone

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Installation of a system of air injection ducts between zone I and II of dryer of drywalls

Modernisation of double batches

Top